Sign in or register

My ECOSS

My shopping cart

   
Business & Industrial>
022482:High-shear emulsifying pump pipeline Single Stage Pipeline(110V,1.5KW)
Unit:
set
Price:
1,259.00$
Weight:
40.00kg
QTY:
Out Of Stock
     

Similar products

160229:Color Matching Cabinet 4 light sources: D65 TL84 UV F Size:71*42*57cm

153061:Optical Eyeglasses Display case

027282:Hot and Cold Belt Cutting Machine(Blue panels)

190417:Stair Climbing Hand Truck

219407:Bakery SHowcase

20140320

New Emulsion pump High Shear Emulsifying Pump TRL1-80 110v 1.5KW

 

biological medicine, food industry, cosmetic care,

 ink coating, nano materials, petrochemical, printing and dyeing auxiliaries,

paper making, pesticides and chemical fertilizers, plastics, rubber,

and other fine chemical mixing, dispersion and emulsification. 

 

Specification:

power

1.5KW
 Voltage 110v
speed 2800-2900r
Flow range 0-1.5m3/h
N-D

N-d:φ4-14

Material: stainless steel 304

 

 

1.

Check whether the import and export seal is good, there are no impurities, metal chips and other materials that have damaged equipment into the body.

2.

Check whether the motor and the machine are in good condition when the transportation is out of the warehouse. When the power switch is connected, a safe contact motor device should be installed.

3.

Before the connection between the import and export process pipe and the process pipe, first, clean the process pipeline, and ensure that the process pipeline without welding slag, metal chips, glass chips, quartz sand and other damaged equipment can be connected with the machine after the hard material.

4.

The selection of the installation position of the TRL1 pipeline equipment and the nearest location of the container are such as the bottom of the container. The pipeline must be simple and direct, as far as possible to reduce the components of the elbow pipe, thus reducing the resistance of the material in the circulation process.

5.

The choice of location for intermittent equipment installation is suitable for vertical level of containers. When dumping, it must be well sealed, moisture-proof, moisture proof, dust-proof and explosion-proof.

6.

Before starting the machine, first, turn the spindle, the hands feel the light and heavy, flexible, no other frictional sound and abnormal sound.

7.

When installing the pipeline, the inlet and outlet pipe adopts the clamp live connection structure.

8.

After the completion of the above work, the power supply is started, and the steering axis of the motor steering axis is checked and checked repeatedly.

Attention and maintain

1. The cooling water is usually connected before the machine is opened, and the cooling water is shut down first and then the cooling water can be used.

2.The cooling water pressure is less than 0.2Mpa

3.The material must enter the working chamber, and it can be switched on. It is also necessary to ensure that it does not run in the condition of material failure, so as to avoid idling and cause mechanical seals (machine seals) to burn out or affect service life. 

Important:

After confirming the sealing of the cooling water, the motor is started, and the motor steering should be operated with the steering sign of the main shaft, and the reversal is strictly prohibited!

It can be Idle and Reversal!!!!!(You must be attention )

Item Included:022482

   High Shear Emulsifying Pump X1

无标题文档

About Us Product Service Shipping Payment Privacy refund Warranty

Copyright eezglobal.com All Rights Reserved